Janod has stabilized some of the rock faces along the railway that leads into the mine. We were called in to scale the loose rock from the final walls in some of the more critical areas in the mine. Janod was called to task when the mine needed to install two sets of twelve inch pipes in a 300 foot vertical wall for the evacuation of water from the mine.
|
|
 |