Janod has worked for Iron
Ore of Canada on a number of occasions. We developed a
unique system for deviating ground water leaking from the
ceilings in their tunnels into the ditches and installed it
over a period of three years. We stabilized a massive rock
structure adjacent to the main crusher using a combination
of rock bolts, grout injection into voids in behind the structure
and shotcrete to support the fractured areas and eliminate
the weathering of the surrounding structures.
We have also scaled the rock out of
a highly fractured wall that was causing delays in production
and putting their personnel in danger due to massive failures
in the face.
|